Saturday, July 24, 2021

Become part of our community

captcha 
'Magdalena 2' River Bridge 99% Complete 'Magdalena 2' River Bridge 99% Complete Source: Agencia Nacional de Infraestructura

‘Magdalena 2’ Connecting Medellin to ‘Ruta del Sol’ Highways Wins US$740 Million Finance

Infrastructure Written by  Wednesday, 30 June 2021 15:20 font size decrease font size increase font size 0
Rate this item
(1 Vote)

Colombia’s infrastructure agency (Agencia Nacional de Infraestructura, ANI) announced today (June 30) that the “Magdalena 2” project linking Medellin northward to the “Ruta del Sol” highways just won a COP$2.8 trillion (US$740 million) loan deal organized by Colombian coordinator Financiero de Desarollo Nacional (FDN).

The loan deal for ANI’s “Magdalena 2” concession “guarantees continuation of the execution of highway construction works that connect the Antioqueño municipality of Remedios with the Puerto Berrío bypass connector and then onward to the ‘Ruta del Sol’ highways at Cimitarra, Santander,” which will speed freight traffic to-and-from Cartagena and northern ports on the Caribbean.

FDN’s organization of the loan package involves U.S.-based Goldman Sachs, Spain’s Banco Santander, Bancolombia, Japan’s Sumitomo Mitsui, the Bank Credit Institute of Spain (ICO), France’s Credit Agricole Corporate and Investment Banking, Banco de Credito del Peru (BCP), Germany’s Siemens Financial Services and CAF-AM Ashmore.

“The financing is made up of three tranches that include a local loan in Colombian pesos, a loan in U.S. dollars and a bond issue governed under U.S. regulation. The sum of these three tranches guarantees all the resources for this financial closing,” according to ANI.

This “fourth generation” (4G) project includes 144 kilometers of new highway and a nearly complete, 1.36-kilometers-long bridge over the Magdalena River.

“It is expected that ‘functional unit four’ of the project -- linking the Puerto Berrío bypass with Cimitarra thus connecting the departments of Antioquia and Santander -- will come into operation in the second half of 2021, while by 2023 the construction phase will be completed for the entire corridor,” according to ANI.

Read 134 times Last modified on Wednesday, 30 June 2021 15:25

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.

About Medellin Herald

Medellin Herald is a locally produced, English-language news and advisory service uniquely focused upon a more-mature audience of visitors, investors, conference and trade-show attendees, property buyers, expats, retirees, volunteers and nature lovers.

U.S. native Roberto Peckham, who founded Medellin Herald in 2015, has been residing in metro Medellin since 2005 and has traveled regularly and extensively throughout Colombia since 1981.

Medellin Herald welcomes your editorial contributions, comments and story-idea suggestions. Send us a message using the "contact" section.

Contact US

logo def
Medellin Herald: Find news, information, reviews and opinion on business, events, conferences, congresses, education, real estate, investing, retiring and more.
  • COL (4) 386 06 27
  • USA (1) 305 517 76 35
  •  www.medellinherald.com 
  •  This email address is being protected from spambots. You need JavaScript enabled to view it. 
  • Medellin, Antioquia, Colombia

Medellín Photo Galery

Medellin, contrasting colors and styles by Gabriel Buitrago

MPGMPGMPGMPGMPGMPGMPGMPGMPGMPGMPGnav